The Way Urban Towns at Erin Mills and South Millway is currently under construction with occupancy scheduled for Fall 2020. Way Towns Phase 1 is sold out, register for first access to Phase 2.
Stacked urban Towns developed by Metropia, Sorbara Group of Companies and Greybrook Realty Partners. The Way Urban Towns feature 2 and 3 storey towns with sizes ranging from 988 to 1339 square feet.
Modern 2 storey stacked towns with two and three bedroom layouts with a master ensuite, private bathrooms and top-floor laundry.
Urban condo townhomes will feature an open concept kitchen leading to living and dining areas, with terraces on the upper floors.
The development will consist of single level 2 bedroom units and 2 Storey 3 bedroom units with 2 baths on upper floor and powder room on main floor with sizes ranging from 988 sq.ft. to 1,340 sq.ft.
All units will come with underground parking and each condominium townhouse will have a monthly maintenance fees.
An affordable investment opportunity for first time home buyers and investors to own a stacked townhouse in Mississauga’s most desirable neighborhood.
Live Your Way at The Way Urban Towns
- Two-bedroom and three-bedroom suite options
- A stainless steel, energy-efficient appliance package
- Open concept kitchen with Quartz counter tops
- Two full upper-floor bathrooms with main-floor powder rooms in each suite
- Dedicated underground parking included with each unit
- Rooftop Towns with 370 sq. ft. terrace or garden terrace for each lower level unit
The Way Urban Towns Highlights:
- 7 minute drive to the Erin Mills Town Centre
- 6 minute drive to the Erindale GO Station
- Steps away from Credit Valley Hospital
- Short commute to University of Toronto – Mississauga campus
- Short drive from HWY 403 and QEW expressway
- Great opportunity to invest in the vibrant Erin Mills neighborhood
- Nearby parks include Brookmede Park, King’s Masting Park and South Common Park
Purchaser Incentives
- Absolute First Access to Pricing and Floor Plans
- The Very Best Incentives & Promotions For Our Clients Only
- Extended Deposit Structure
- Capped Development Levies
- Right of Assignment
- Free Mortgage Arrangements
Deposit structure
- TENTATIVE PAYMENT PLAN
- $5,000 with Agreement
- Balance to 5% in 30 days
- 5% in 150 days
- 5% in 365 days
- 5% on occupancy
Brochure
- Download The Way Brochure
Availability
- Sold Out. The Way Phase 2
Floorplans
- Download The Way Floorplans